Institutional-scale energy and waste management.

Nairobi school 32 m³ project

A 32 m³ institutional plant treating daily kitchen and sanitation waste while supplying the school kitchen.

Capacity
32 m³
Technology
fixed dome
Location
Nairobi, Nairobi
Completed
2024
Sector
institutional
Feedstock
Food waste, Human waste
Applications
Cooking, Water heating
Technical review
approved
Nairobi school 32 m³ project
01

Client challenge

A large daily waste load and high cooking-fuel expenditure in a constrained urban compound.

02

Site conditions

Urban compound with limited free area, requiring compact layout and protection of drainage.

03

Feedstock assessment

Kitchen waste from daily meal preparation combined with sanitation flow from the school.

04

Energy demand

Bulk cooking for the student population and hot water for the kitchen.

05

Engineering response

A 32 m³ digester with an expansion chamber and a gas network reaching the kitchen block.

06

Construction sequence

Excavation, reinforced construction, plastering, gas-tightness testing and pipe installation.

07

Gas handling

Main valve, condensate trap, filtration and pressure control before the institutional burners.

08

Appliance connections

Commercial cookers and a water heater.

09

Slurry or effluent management

Effluent managed in line with institutional sanitation requirements.

10

Commissioning

Charged, tested and commissioned with kitchen-staff training.

Documented outcomes

  • Daily kitchen and sanitation waste treated on site

    Evidence: Company site observation

Outcomes are labelled by evidence type: measured, company estimate, client-reported or unverified historical claim. Unverified claims are never published as fact.