Skip to content
Chapter 01 - Waste contains energyKenyan Biogas Engineering

Waste contains energy.We engineer the system that releases it.

Home Biogas Kenya designs and builds biogas and organic-waste systems for homes, farms, institutions and commercial facilities.

5

Published projects

32 m³

Largest published system

3

Counties served

26

Engineering services

  1. 01 Organic waste
  2. 02 Collection
  3. 03 Preparation
  4. 04 Anaerobic digestion
  5. 05 Biogas production
  6. 06 Gas treatment
  7. 07 Gas distribution
  8. 08 Cooking / heating / power / machinery
  9. 09 Bio-slurry
  10. 10 Soil and agriculture

Chapter 02

Enter the plant

Hover, tap or use the keyboard to inspect every component

Feed slurryBiogasDigested slurry
Select markers 01-12
ABOVE GROUNDBELOW GROUND010203040506070809101112

Component 03 / 12

Digester

Sealed anaerobic chamber; retention time typically 30-60 days depending on temperature and feedstock.

Feedstock scenario

Steady, reliable gas; mix roughly 1:1 with water.

Chapter 03

See what the gas powers

One gas line. Nine productive end uses.

DIGESTERHOUSEHOLDCOMMERCIALOVENWATERPOULTRYBIOGASGENERATORCHAFFWATER

Application 01 / 9

Household cooker

Daily family cooking on one or two burners.

System requirement

From ~6 m³ digester with stable daily feeding.

Chapter 04

Built in Kenya

Only technically reviewed projects with cleared media rights appear here

5 / 5 projects

Kerarapon 16 m³ system

One plant. Multiple productive uses.

Kerarapon 16 m³ system

A 16 m³ fixed-dome plant feeding a household kitchen, an oven, a water heater, a generator and a chaff cutter from a single digester.

Capacity
16 m³
Technology
fixed dome
Status
completed
Location
Kerarapon, Kajiado
Feedstock
Cow manure, Food waste
Applications
Cooking, Baking, Water heating, Electricity, Chaff cutting

Capability Matrix

From feasibility study to commissioning and maintenance

We design, construct, commission and maintain closed-loop anaerobic digesters engineered for East African agricultural and institutional waste streams.

All engineering solutions →

Chapter 05

Configure a possible solution

No estimate is produced without your measured quantity

Which waste do you have?

Select every stream available on the site.

Chapter 06

Start a project

Site Survey & Project Kickoff

Bring us your waste stream, your energy demand and your site. We survey, design and build the system that connects them - then train the people who run it.

Request assessment

Response guaranteed within two working days