Skip to content
Chapter 01 - Taka zina nishatiUhandisi wa Biogesi Kenya

Taka zina nishati.Tunabuni mfumo unaoiachilia.

Home Biogas Kenya inabuni na kujenga mifumo ya biogesi na usimamizi wa taka kwa nyumba, mashamba, taasisi na biashara.

5

Published projects

32 m³

Largest published system

3

Counties served

26

Engineering services

  1. 01 Organic waste
  2. 02 Collection
  3. 03 Preparation
  4. 04 Anaerobic digestion
  5. 05 Biogas production
  6. 06 Gas treatment
  7. 07 Gas distribution
  8. 08 Cooking / heating / power / machinery
  9. 09 Bio-slurry
  10. 10 Soil and agriculture

Chapter 02

Ingia kwenye mtambo

Hover, tap or use the keyboard to inspect every component

Feed slurryBiogasDigested slurry
Select markers 01-12
ABOVE GROUNDBELOW GROUND010203040506070809101112

Component 03 / 12

Digester

Sealed anaerobic chamber; retention time typically 30-60 days depending on temperature and feedstock.

Feedstock scenario

Steady, reliable gas; mix roughly 1:1 with water.

Chapter 03

Ona gesi inavyotumika

One gas line. Nine productive end uses.

DIGESTERHOUSEHOLDCOMMERCIALOVENWATERPOULTRYBIOGASGENERATORCHAFFWATER

Application 01 / 9

Household cooker

Daily family cooking on one or two burners.

System requirement

From ~6 m³ digester with stable daily feeding.

Chapter 04

Imejengwa Kenya

Only technically reviewed projects with cleared media rights appear here

5 / 5 projects

Kerarapon 16 m³ system

One plant. Multiple productive uses.

Kerarapon 16 m³ system

A 16 m³ fixed-dome plant feeding a household kitchen, an oven, a water heater, a generator and a chaff cutter from a single digester.

Capacity
16 m³
Technology
fixed dome
Status
completed
Location
Kerarapon, Kajiado
Feedstock
Cow manure, Food waste
Applications
Cooking, Baking, Water heating, Electricity, Chaff cutting

Capability Matrix

Kuanzia utafiti wa uwezekano hadi ujenzi na matengenezo

Tunabuni, tunajenga na kutunza mitambo ya biogesi iliyoundwa kwa ajili ya taka za kilimo na taasisi nchini Kenya.

All engineering solutions →

Chapter 05

Panga suluhisho linalowezekana

No estimate is produced without your measured quantity

Which waste do you have?

Select every stream available on the site.

Chapter 06

Anza mradi

Site Survey & Project Kickoff

Bring us your waste stream, your energy demand and your site. We survey, design and build the system that connects them - then train the people who run it.

Omba tathmini

Response guaranteed within two working days