Article
Sizing a biogas plant honestly
Why no capacity can be quoted before a site survey.
Sizing begins with a measured daily waste quantity, not a guess. From there, the slurry volume, retention time and gas storage requirement follow.
Energy demand matters just as much: a plant that produces enough gas but cannot deliver it at the required pressure will disappoint the user. Both sides of the calculation must be measured on site.
